PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed shear studs throughout the 3rd Floor Facing East (800x600).jpg Installed shear studs throughout the 4th Floor Facing South (800x600).jpg Installed wire mesh and rebar at the 2nd Floor Facing North (800x600).jpg Welded embeds and couplers at around the 3rd Floor Facing West (800x600).jpg Welded embeds and couplers at the 4th Floor Facing North (800x600).jpg
Previous page Welded embeds and couplers at the 4th Floor Facing North (800x600)
Welded embeds and couplers at the 4th Floor Facing North (800x600)